GNT: a 30 t/h processing line for black carrots

Handling black carrots

For GNT, Spinnekop built a line for the reception and handling of black carrots, with a capacity of 30 tonnes per hour. The carrots arrive in bulk, are received and cleaned, and are conveyed into the processing hall in a steady flow.

Cleaning and conveying

Inside the hall, screw conveyors and cleaning equipment move the carrots through the line and prepare them for further processing.

The full Spinnekop process

As on every project, we followed the complete Spinnekop process: from analysing the requirements and engineering the layout, to building the machines, installing them on site and commissioning the line.